Past Work by Person (report)

Subscribe to Past Work by Person (report) 4 post(s), 3 voice(s)

 
Avatar Melinda administrator 71 post(s)

The Past Work by Person Report

The Past Work by person report shows a list of all members within the project or space and their:

  • reported work, which has been logged in the system and is shown in the green bar
  • assumed work, which has been automatically tracked and is shown in the orange bar
  • total work share owned by each member, in percentage

This report shows as a glance where work needs to be updated, as well as who owns how much of the work. It looks like this:

All Reports:
Work by Person
Calendar Days of Work
Remaining Work
Total Work
Past Work by Person

 
Avatar rh 2 post(s)

Is it possible to generate a report which shows the reported work per person per period of time (e.g. month)?

 
Avatar Adam Sanderson administrator 111 post(s)

@rh: Not at the moment, however expanded time tracking is on the table for later.

 
Avatar rh 2 post(s)

Great! I’m looking forward to this enhancement.

Login to reply